Banner DF-G1-PR-Q7 Istruzioni per gli Interventi Pagina 108

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 253
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 107
6 – Operation software
DPN 402197 © TSS (International) Ltd Page 29 of 32
Windows operating environment. Wait while Windows closes and then power-off
the SDC when the screen tells you that it is safe to do so.
CAUTION
DO NOT power-off the SDC until it is safe to do so otherwise Windows™ will log the
fact that it was incorrectly closed. This will cause the SDC to enter a diagnostic check
automatically when you next operate it, extending the time that it takes for the 350 Sys-
tem to become operational after power-on.
If you power-off the SDC before Windows has closed properly, you might corrupt some
of the data logging files from the survey.
5. Power-off the sub-sea installation.
If you power-off the sub-sea installation before you close DeepView for Windows,
the program will register a communications failure.
6. Check the 350 System.
After you recover the ROV, perform all the post-survey checks and make any nec-
essary repairs to the 350 System before you store it. This helps to ensure the Sys-
tem will be ready for immediate deployment when needed again. Use a fresh
water hose to wash deposits of salt and debris off the System.
Refer to Section 7 for a suggested survey procedure using the 350 System.
6.4 REPLAYING A LOG FILE
When you start to replay a log file an additional tool bar appears at the top of the run
window.
Figure 6–18: Replay a log file screen
Vedere la pagina 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 252 253

Commenti su questo manuale

Nessun commento