Banner DF-G1-PR-Q7 Istruzioni per gli Interventi Pagina 41

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 253
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 40
350 Cable Survey System
DPN 402197 © TSS (International) Ltd Page 4 of 14
Mount the SEP housing according to the following guidelines:
Eliminate any possibility of snagging or damage to the SEP housing by installing it
inside the outer limits of the ROV frame.
Locate the SEP housing so that you may install the cables easily between the
sub-assemblies of the 350 System.
Do not apply sharp bends or other mechanical stresses to the cables during instal-
lation or operation. Route the cables between the components of the sub-sea
installation, and use plastic clips to secure them to the ROV frame.
On small ROVs, position the SEP close to the centre of buoyancy to avoid upset-
ting the ROV trim.
Tighten the mounting straps firmly so that the SEP housing cannot move under
the influence of ROV vibration or currents in the water.
Refer to sub-section 4.1 for instructions to make the electrical connections
between the sub-sea components.
Figure 3–1: SEP mounting arrangement
Vedere la pagina 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 252 253

Commenti su questo manuale

Nessun commento